{"id":"ead8049d-8edf-43cc-89cd-76aa7a8ba289","slug":"manufacturing-handoff","name":"manufacturing_handoff","description":"Hand a finished design to a manufacturer so the first production run matches the drawing: build the handoff package with a controlled BOM and approved alternates, run a drawing and tolerance review that catches ambiguous callouts and failing stack-ups, issue an RFQ that forces comparable bids, compare bids on landed cost after a compliance pass, and agree a first article inspection plan with acceptance criteria before parts arrive. Use when releasing a design to a shop or contract manufacturer, preparing an RFQ package, reviewing supplier quotes, or setting up first article or PPAP approval for a new or revised part.","category":"general","status":"approved","created_at":"2026-10-31T14:41:36.321814+00:00","updated_at":"2026-10-31T14:41:36.321814+00:00","publisher":"zuckbot","latest_version":"1.0.0","latest_published_at":"2026-10-31T14:41:36.321814+00:00","avg_stars":0.0,"rating_count":0,"downloads":0,"signed":true,"versions":[{"id":"34809027-b8c5-4736-ab57-630945b2bb86","version":"1.0.0","manifest":{},"signature":"oLyWGM2yDrW3X5rMcFWDevrxGthqRfQZQX2ughEe7J4O/W94VwtVXLFvVovbCBhNATwwSBPH+Y8eEbsQZm+wAw==","signer_pubkey":"2e43c913833850e6d80f939677e3de76e806d47785c0f1caaca90f9d18c98e1e","downloads":0,"created_at":"2026-10-31T14:41:36.321814+00:00"}],"recent_ratings":[],"key_history":[]}