Build and run a working coalition across organisations: map who should be at the table with a partner sheet and power map, write shared asks every partner can sign, set meeting and decision rules and credit sharing in a working agreement, recruit through one-to-ones, and keep partners active between moments with a contact rhythm and health check. Use when several groups need to act together on one goal, when a coalition is stalling, drifting, or losing partners, or when starting a joint campaign, table, or alliance.

0 installs no ratings yet every version Ed25519-signed

Install

# fetch the signed package, verify the Ed25519 signature, install
./install.sh coalition-building

Skill contents


name: "coalition_building" description: "Build and run a working coalition across organisations: map who should be at the table with a partner sheet and power map, write shared asks every partner can sign, set meeting and decision rules and credit sharing in a working agreement, recruit through one-to-ones, and keep partners active between moments with a contact rhythm and health check. Use when several groups need to act together on one goal, when a coalition is stalling, drifting, or losing partners, or when starting a joint campaign, table, or alliance."


Coalition Building

Purpose

Get separate organisations to act as one body on one goal, without pretending they agree on everything else. A coalition is a group of individuals and organisations with a common interest who agree to work together toward a common goal. That agreement is the whole asset. Everything in this skill protects it: a short set of shared asks, written decision rules, fair credit, and steady contact between public moments.

This skill covers forming a coalition, recruiting partners, governing it, and keeping it alive. It does not run the campaign the coalition exists for. Vote counting and testimony belong to legislative advocacy, supporter mobilisation belongs to campaign skills, and a single organisation strategic plan is a different job. The worked example in references/worked-launch-plan.md is fictional and shows a full launch from frame to review.

Workflow

1. Test whether a coalition is the right tool

Start only when all three are true:

If the second point fails, do relationship work first and come back. Building structure on top of a missing shared ask produces a mailing list with bylaws.

Write the frame before recruiting anyone, following the frame used by the Center for Nonprofit Excellence: the community level problem, the vision, the mission, and specific measurable goals. One page. Every later dispute about scope gets settled against this page.

2. Form the core group first

Recruit a core of partners who will do the founding work before any public invitation:

Do not announce a coalition before the core can sign its own asks. An announcement with no signed core reads as one organisation borrowing other names.

3. Map partners and power

Build the partner sheet from references/partner-mapping-template.csv and the method in references/partner-mapping.md. One row per organisation, with sector, tier, status, working contact, what they bring, what they need, whether they signed the current shared asks, who can commit them, and contact dates.

Run the sheet checks before every recruitment round and every full meeting:

python3 scripts/coalition.py check partners.csv python3 scripts/coalition.py roster partners.csv python3 scripts/coalition.py due partners.csv --as-of 2026-10-20 --days 7

Draw the power map on paper first: name the decision maker, plot affected groups and influencers on support against influence, draw the connections between them, and circle the first one-to-one targets. The full method is in references/partner-mapping.md.

Check the roster for gaps the counts expose: a sector the decision maker listens to is missing, affected people are only spoken for, or the core has fewer than three partners who can sign.

4. Recruit through one-to-ones, not blasts

Admission rules stay transparent: any partner who signs the current asks and accepts the working agreement terms for its tier can join. Write exceptions down with the reason.

5. Lock the shared asks

Draft three to five asks, each one sentence, each signable without a caveat. Use the template and signing test in references/agreement-templates.md.

The five conditions from Kania and Kramer Collective Impact work in Stanford Social Innovation Review in 2011 are a useful check at this stage: common agenda, shared measurement, mutually reinforcing activities, continuous communication, and backbone support. If one is missing, name who will build it and by when. The frame in step 1 plus the signed asks cover the common agenda. The rest get built in steps 6 and 7.

6. Set the working agreement, roles, and decision rules

Core and active partners sign the working agreement in references/agreement-templates.md. It must settle, in writing:

Name power differences openly in the agreement discussion: budget size, staff size, who takes legal or public risk by acting, and whose members are directly affected. A small partner carrying the largest risk gets a real say on the actions that create that risk, whatever its tier.

7. Run meetings that decide things
8. Share credit on a written rule

Credit fights kill coalitions quietly, so settle credit before the first win:

9. Keep partners active between moments

Coalitions die in the quiet months, not at the big vote. Maintenance, as the Community Tool Box puts it, covers the reason for being, governance, leadership, membership, division of labour, plans, results, funding, visibility, public support, and the spirit of the group.

10. Handle conflict and the end on purpose

Output Contract

A coalition run keeps these current:

Operating Rules

  1. Never claim a partner, a signer, or a constituency number you cannot point to in the sheet and a signed document. Decision makers check. One inflated claim costs the coalition its word.
  2. Coalition voice covers signed asks only. Partners speak freely under their own names on anything else, and the coalition never implies otherwise.
  3. Keep the partner sheet, needs notes, and internal power map private to the coalition. A partner needs and internal doubts were shared for the work, not for circulation.
  4. Use a person story, photo, or name only with that person permission, recorded. Withdraw it when permission is withdrawn.
  5. Verify every figure used in coalition material against its primary source, and record the source on the material. If a number cannot be traced, cut it.
  6. Get legal review before the coalition handles shared funds, employs shared staff, files as an entity, or lobbies where registration rules may apply. This skill is not legal advice, and tax exempt partners face their own limits on lobbying and election related work that the coordinator must check with counsel for the partners affected.
  7. Label illustrative material as illustrative. The worked plan and the template rows are fictional examples. Never present an example partner, figure, or result as a real one.
  8. Write in plain language in all coalition documents. No em dashes. Short sentences partners can repeat without notes are the test for every ask and announcement.

Versions

v1.0.02026-10-20 · 0 installs · Ed25519-signed./install.sh coalition-building 1.0.0bundle (.zip)

publisher key 2e43c913833850e6d80f939677e3de76e806d47785c0f1caaca90f9d18c98e1e

Ratings

No ratings yet — be the first to rate it.