Run a structured multi-role review session where PM, Architect, Developer, and QA personas debate the same proposal in timed rounds, with role cards, conflict rules, and a captured decision log. Use when a plan, design, or architecture choice needs real pushback from multiple angles, when one viewpoint keeps dominating reviews, or when you want a repeatable adversarial review without booking a room.
./install.sh dev-team-roleplayname: dev_team_roleplay description: Run a structured multi-role review session where PM, Architect, Developer, and QA personas debate the same proposal in timed rounds, with role cards, conflict rules, and a captured decision log. Use when a plan, design, or architecture choice needs real pushback from multiple angles, when one viewpoint keeps dominating reviews, or when you want a repeatable adversarial review without booking a room.
One agent asked "is this a good plan?" gives you polite optimism. One prompt wearing four hats gives you polite theater. This skill is a facilitation method: persistent dev-team roles that hold their positions across structured rounds, with written conflict rules and a decision log at the end. The roles are allowed to fight. That is the point. It descends from two established review traditions: Edward de Bono's Six Thinking Hats (1985) for the structured thinking sequence and dedicated process-control role, and Michael Fagan's software inspection (IBM, 1976) for role discipline, the author-may-clarify-but-not-defend rule, and detection-before-resolution.
Use it for: architecture choices, product plans, API designs, launch go/no-go, vendor picks, any decision where you suspect your own enthusiasm is doing the reviewing.
Do not use it for: factual questions, creative drafts that need craft feedback, decisions already made, or topics with no real downside.
Write a one-page brief before any role opens its mouth:
No brief, no session. Roles need a target, not a vibe.
Four debaters, one facilitator. The facilitator is the agent running the session and never argues a position. Roles (full cards in references/role-cards.md):
Optional fifth seat: a pre-mortem round (Gary Klein, via Harvard Business Review) when the stakes are high: everyone writes the post-mortem of the plan's failure, then works backward to causes.
Four rounds, timed and separate. Never merge rounds.
Round 1: Clarify (questions only, no verdicts). Each role asks up to three questions of the brief. The author of the proposal answers. Nobody is allowed an opinion yet. Missing answers go in the log as open questions.
Round 2: Argue. Each role makes its case in turn, PM first, QA last. Timed: give each role the same budget (say, one full pass over the proposal each). Roles must land at least one genuine objection. "I have no concerns" is not a valid position for a role that holds a mandate.
Round 3: Cross-examine. Roles question each other directly. PM defends user impact against Architect's simplifications. QA probes failure modes Developer waved off. Developer challenges whether Architect's elegant shape ships on time. The facilitator's only job here is time and temperature: keep rounds on budget, keep arguments aimed at the proposal, never the role.
Round 4: Verdict. Each role votes: SHIP, SHIP-WITH-CHANGES, or BLOCK, with a one-sentence reason. A BLOCK must name the specific change that would lift it. The facilitator merges the four votes into the decision log and writes the final recommendation, including dissent that stands.
Every session ends with a written record (template in assets/decision-log-template.md). It holds: the proposal, each role's objections, the open questions, the votes, the recommendation, and the dissent that survived. The decision log is the actual output. The debate is just how you earned it.
A finished session delivers one decision log file, containing:
Proposal: "Rewrite the billing service in Rust before Q2."
publisher key 2e43c913833850e6d80f939677e3de76e806d47785c0f1caaca90f9d18c98e1e
No ratings yet — be the first to rate it.