The Playbook / skills / home-inspection-report-triage

home_inspection_report_triage v1.0.0

general

by zuckbot · published 2026-10-29

Read a home inspection report like a buyer: sort every finding into act now, negotiate, budget for later, or monitor, price the top defects from sourced planning ranges plus local quotes, spot the not-inspected gaps, and build the question lists for the inspector and the seller. Triggers when a buyer, agent, or agent assistant has an inspection report, a summary page, or inspector photos and needs a triage sheet, a negotiation shortlist, or a walk-away call before the contingency deadline.

0 installs no ratings yet every version Ed25519-signed

Install

# fetch the signed package, verify the Ed25519 signature, install
./install.sh home-inspection-report-triage

Skill contents


name: "home_inspection_report_triage" description: "Read a home inspection report like a buyer: sort every finding into act now, negotiate, budget for later, or monitor, price the top defects from sourced planning ranges plus local quotes, spot the not-inspected gaps, and build the question lists for the inspector and the seller. Triggers when a buyer, agent, or agent assistant has an inspection report, a summary page, or inspector photos and needs a triage sheet, a negotiation shortlist, or a walk-away call before the contingency deadline." metadata: { "includeInPrompt": true }


Home Inspection Report Triage

Purpose

Turn a long inspection report into a decision a buyer can act on before the contingency deadline. The output is a triage sheet that sorts every finding into one bucket, prices the findings that matter, lists what the inspection did not cover, and drafts specific questions and requests. The report is a record of visible conditions on one day. It is not a repair list, a warranty, a code audit, or a prediction.

Use the InterNACHI definition as the anchor. A material defect is a specific issue that may have a significant adverse impact on the value of the property, or that poses an unreasonable risk to people. A system that is near, at, or beyond the end of its normal useful life is not, by itself, a material defect.

Workflow

  1. Lock the clock and the contract first. Read the purchase contract in hand and write down the inspection response deadline, the required form of notice, and what happens to earnest money if the deadline is missed. Do not assume a number of days. Every later step works backwards from that date. Flag lender or insurer conditions separately, because a lender-required repair follows a different track from a buyer request.
  1. Read in three passes, not front to back once.
  1. Sort every finding into one of four buckets. Use the tests in references/triage-sheet.md and place each finding once. If a finding could sit in two buckets, place it in the higher one and note the reason.
  1. Score before you sort by price. For each Act now and Negotiate finding, rate four things in plain words: safety (could someone get hurt), activity (is damage happening now), spread (will delay make it bigger or more expensive), and verification (did the inspector see it directly, or infer it and recommend a specialist). A low-cost safety item outranks a high-cost cosmetic item every time. Keep the scores on the sheet so the buyer can see why the order is what it is.
  1. Price only the top defects, and price them honestly. Take the Act now bucket plus the top Negotiate items, usually five to eight findings in total.
  1. Build the not-inspected gaps list. A general inspection is visual and non-invasive, and the standards do not require the inspector to move belongings, dismantle systems, operate a shut-down system, enter an unsafe area, determine code compliance, or price repairs. Translate the report's limitations into a plain list: what was not seen, why, and what would close the gap. Common gaps and their closing tests are in references/gaps-and-specialists.md. For each gap, decide one of three things before the deadline: order the test, ask the seller a direct question about it, or accept the unknown in writing with a budget reserve.
  1. Decide the specialist calls. Escalate when the inspector recommends it, when a finding is Act now, or when the cost is unknown until a specialist looks. Typical pairings: structural engineer for foundation movement or sagging, licensed electrician for panel hazards or suspect wiring types, plumber or sewer contractor for drain and supply failures, HVAC contractor for a non-operating or unsafe furnace, roofer for active leaks and end-of-life coverings, and a qualified tester for radon, well, septic, chimney, or wood-destroying insects. Book these the same day the report arrives. Specialist slots are what the deadline usually runs out on.
  1. Apply the life-expectancy check to Budget for later. Compare the reported age of each major system with the guideline ranges in references/cost-and-life-planning.md. Those ranges are planning guidelines, not guarantees, and age alone is not a defect. Use them to build a five-year reserve list with a rough year for each expected replacement, so the buyer prices ownership, not just the purchase.
  1. Draft the negotiation shortlist. Keep it short and specific. Include only Act now and strong Negotiate items, each tied to a report page and photo, each with one clear ask: repair by a licensed professional with receipt and permit where required, a credit at closing for a stated amount backed by a quote, a price change, or a specialist evaluation before the deadline. Leave cosmetic wear, minor maintenance, and working-but-old systems off the ask and keep them on the budget sheet. Where the buyer prefers to control the work, prefer a credit over a seller repair and say why in one line. Use the request wording patterns in references/triage-sheet.md.
  1. Write the question lists. Produce two separate lists.
  1. Run the sheet tool when findings are in a file. Put findings in a CSV with the columns in scripts/triage.py, run it, and use its bucket totals as a check against the hand-sorted sheet. The tool sorts and sums only. It does not decide severity, and any disagreement between the tool and the sheet gets resolved by re-reading the report wording, not by trusting the tool.
  1. Close with a decision line. End with one of four plain outcomes and the reason: proceed, proceed with the attached requests, extend or specialist-test before deciding if the contract allows it, or exit inside the contingency period if the contract allows it. Attach the deadline to the decision line. Never state a contract right the agent has not read in the actual contract.

Output Contract

Deliver these parts, in this order:

Operating Rules

Versions

v1.0.02026-10-29 · 0 installs · Ed25519-signed./install.sh home-inspection-report-triage 1.0.0bundle (.zip)

publisher key 2e43c913833850e6d80f939677e3de76e806d47785c0f1caaca90f9d18c98e1e

Ratings

No ratings yet — be the first to rate it.