Film a contractor job site walkthrough that becomes the estimate: a one-pass shot list that captures every surface, measurement, and access problem, on-camera narration that names materials and quantities as they are filmed, stills pulled from the footage for the written quote, and a short client cut to send with the bid. Use when estimating a remodel, repair, or trade job from a site visit, when a second trip for missed measurements keeps happening, or when scope arguments start after a quote is sent.

0 installs no ratings yet every version Ed25519-signed

Install

# fetch the signed package, verify the Ed25519 signature, install
./install.sh job-site-walkthrough-video-estimates

Skill contents


name: "job_site_walkthrough_video_estimates" description: "Film a contractor job site walkthrough that becomes the estimate: a one-pass shot list that captures every surface, measurement, and access problem, on-camera narration that names materials and quantities as they are filmed, stills pulled from the footage for the written quote, and a short client cut to send with the bid. Use when estimating a remodel, repair, or trade job from a site visit, when a second trip for missed measurements keeps happening, or when scope arguments start after a quote is sent." metadata: { "includeInPrompt": true }


Job Site Walkthrough Video Estimates

Purpose

Turn one site visit into three things at once: the measurement record, the photo record, and the client-facing proof that the quote matches the house. The camera pass runs in estimate order, the narration states the quantity for each line as it is filmed, and every line in the written quote points back to a timecode and a still. When a client later says a surface was not in the price, or a crew member who never visited asks what a room looked like, the answer is in the footage, not in memory.

This skill covers residential and light commercial remodel, repair, and trade estimating walks. It does not cover listing video for selling a finished home (use real_estate_video for that), formal quantity surveying from drawings, or a safety inspection. Flags filmed on the walk are estimating notes, not code or safety findings.

Files that ship with this skill:

Workflow

1. Prep before you leave

Confirm permission to record inside the home, who will be present, and how long you have. A walk that gets cut short loses the rooms at the end of the route, so ask for the full window up front.

Ask three questions before the visit, and write the answers where the estimator will see them:

Kit for one person, one pass:

Run the planner before the visit and bring its output: python3 bin/walkthrough_plan.py --project "Project name" --rooms "Exterior and Access,Kitchen,Primary Bath" --outdir ./job-name It writes shot-list.md in walk order, takeoff.csv with one row per standard check, and stills.sh for pulling stills later.

2. Lock the route in estimate order

Walk outside in, in the order the estimate will be written: exterior and access first, then rooms in the order they will appear as sections in the quote, then systems (panel, shutoffs, attic or crawl access), then the close.

Rules for the route:

3. Shoot each room in four beats

Full detail is in references/shot-list.md. The short version, per room:

  1. Wide: stand in the doorway, hold 3 seconds before moving, pan once, slowly. Say the room name and the client goal for the room.
  2. Medium: walk the perimeter at half speed, camera at chest height, shutter at double the frame rate (at 30 fps, 1/60) for natural motion. Lock exposure and white balance per room so colors do not shift mid-room.
  3. Detail: stop on every surface that gets a price. Hold each stop at least 3 seconds. A still pulled from a moving frame is blurry and useless in a quote, so the hold is what makes the stills in step 7 possible.
  4. Measure on camera: see step 4.

Keep the master take long and plain. This is a record first and a client video second. The client cut in step 8 is edited from it, never shot separately.

4. Narrate the estimate while you film

Narration is the core method. Silent footage forces the estimator to guess what they were looking at. Narrated footage transcribes straight into takeoff rows.

Speak this formula for every priced item, in this order: location, item, material, quantity with unit, condition, status.

Example: "Kitchen, north wall cabinets, painted wood uppers, 12 linear feet, doors sticking, measured."

Quantity types, and how to state each one (full table in references/narration-and-takeoff.md):

Discipline that keeps the narration usable:

5. Film access and the problems that change the price

Price is set as much by access as by surfaces. Film all of it, even when the client is standing there and it feels obvious:

Second sweep: after the last room, walk the route once more, fast, with the shot list in hand. Check off any missed check. This sweep is planned, so it takes minutes. An unplanned return trip takes half a day.

6. Flag hazards and regulated work on camera, without diagnosing

Film and narrate flags. Do not pronounce on code, structure, or safety beyond what you can see, and do not disturb a suspect material to check it.

7. Convert the footage the same day

Memory decays fast and the narration only pays off if it becomes rows while the visit is still fresh.

  1. Transcribe the narration, by hand or with a transcription tool, keeping timecodes at least per room.
  2. Fill takeoff.csv: one row per priced item, with line ID, room, timecode, item, unit type, dimensions, quantity, material, condition, and status (measured, assumed, or concealed). Every row must trace to a timecode. A row with no timecode is a row nobody can verify.
  3. Pull the stills. For each row that will appear in the written quote, grab the held detail frame: ffmpeg -ss 00:01:12 -i walkthrough.mp4 -frames:v 1 -q:v 2 kitchen_cabinets.jpg Placing -ss before -i seeks fast, -frames:v 1 takes exactly one frame, and -q:v 2 writes a high quality JPEG. Or fill the timecodes into the generated stills.sh and run it. Name stills by line ID so the quote, the sheet, and the image folder agree.
  4. Build the estimate from the sheet, not from memory. Add waste, labor, and access time as their own lines where they matter, rather than padding a material quantity where nobody can see it.
  5. Write the exclusions and the unknown list into the quote itself: what is not included, and what is priced as an allowance pending a named check. A change order later should be a written amendment with description, reason, itemized cost impact, schedule impact in days, and both signatures before the changed work starts. Say that process out loud before the job is sold, so the first change is not the first time the client hears it.
8. Cut the client copy and send the packet

From the master, cut a short client version: exterior and access in a few seconds, then each room as wide plus best detail, with the client-confirmed choices left in and the measuring left mostly out. Cut it to the shortest length that still shows every room in the quote and nothing that is not in the quote. If a room is in the video and not in the price, either price it or cut it. That mismatch is where scope arguments start.

Send one packet (checklist in assets/estimate-packet-checklist.md): the written quote with line IDs, the stills named by line ID, the client cut, and the exclusions and allowances page. Keep the master footage, the full takeoff sheet, and the narration transcript in the job file. Retention call: keep them at least as long as your contract and local rules require for the job records, and longer if a dispute window is still open. State your retention period in the packet cover note rather than assuming one.

Output Contract

Every job produces, in this order:

  1. The master walkthrough video, filmed in estimate order, with the slate and the unknown list read out loud.
  2. The completed takeoff sheet: every row has a line ID, room, timecode, unit type, dimensions, quantity, material, condition, and a status of measured, assumed, or concealed.
  3. The stills folder: one still per quoted line that shows a surface or condition, named by line ID.
  4. The written quote, built from the sheet, with exclusions and allowances stated in the quote.
  5. The client cut and the packet cover note, sent with the quote.

Operating Rules

  1. One pass in estimate order. Reordering in the office is the cost this method exists to remove.
  2. No silent surfaces. If a surface gets a price, it gets a held detail shot and a spoken quantity. If it has neither, it does not get a firm price.
  3. Measured, assumed, and concealed never share a row status. Concealed conditions are allowances with a named check, never firm quantities presented as fact.
  4. Never invent a dimension, a material, or a condition the footage does not show. If it is not in the video or the notes taken on site, mark it unknown.
  5. The client cut shows only what the quote includes. Video of unpriced work sent with a bid reads as a promise.
  6. Get permission to record, and stop recording in any space the client asks you to skip. Note the skipped space as not surveyed in the quote.
  7. Regulated work gets priced from current primary sources, not from memory. Check the EPA RRP page for lead work, and local permit and licensing rules for the job location, before the quote goes out.
  8. This skill is estimating practice, not legal, code, or safety advice. Flag conditions outside your trade for the licensed trade that owns them, and say so in the quote notes.

Versions

v1.0.02026-11-01 · 0 installs · Ed25519-signed./install.sh job-site-walkthrough-video-estimates 1.0.0bundle (.zip)

publisher key 2e43c913833850e6d80f939677e3de76e806d47785c0f1caaca90f9d18c98e1e

Ratings

No ratings yet — be the first to rate it.