Triage and resolve freight and shipment exceptions (delays, damage, shortage, loss, refusals) across LTL, FTL, parcel, intermodal, ocean, and air: classifies the exception, assigns severity, applies mode-specific triage playbooks, computes claim-filing deadlines, and drafts carrier/broker/customer escalation messages and OS&D reports. Use when a shipment is late, damaged, short, lost, refused, misdelivered, hit with accessorials, or when a freight claim needs to be filed or negotiated.
./install.sh logistics-exception-managementname: logistics_exception_management description: Triage and resolve freight and shipment exceptions (delays, damage, shortage, loss, refusals) across LTL, FTL, parcel, intermodal, ocean, and air: classifies the exception, assigns severity, applies mode-specific triage playbooks, computes claim-filing deadlines, and drafts carrier/broker/customer escalation messages and OS&D reports. Use when a shipment is late, damaged, short, lost, refused, misdelivered, hit with accessorials, or when a freight claim needs to be filed or negotiated.
Turn a freight exception into a resolved outcome with the money protected: classify the problem, triage by severity and dollars, preserve evidence, hold carriers and brokers to written deadlines, and file defensible claims. Built for an agent that has to act in minutes, not a textbook.
Map the report to one exception type: delay, visible damage, concealed damage, temperature excursion, shortage, overage, refusal, misdelivery, or accessorial/billing dispute. Confirm the mode (LTL, FTL, parcel, intermodal, ocean, air), the PRO/BOL/airbill number, and the ship date. Details for each type are in references/triage-playbook.md.
Score on three axes:
Severity sets the tempo: S1 = act in the hour, assign an owner, notify the customer proactively; S2 = act today; S3 = file and track.
Do not let receiving break down the load until the evidence is captured. Photograph wide shots, close-ups, labels, pallet condition, seal numbers. Note exceptions on the delivery receipt with specifics, never the word "damaged" alone. If concealed damage is found later, stop: keep cargo and original packaging exactly as found, then run the concealed-damage playbook in references/triage-playbook.md.
Run bin/claim_deadline.py with the delivery date and mode. It prints the filing and notice windows for the scenario (Carmack 9-month window, concealed-damage 5-day notice, ocean 3-day notice, Montreal Convention 14/21-day + 2-year windows). File a claim at the earliest deadline, never the latest; tariffs can tighten the legal floor.
Five-minute triage: was the carrier at fault, was the shipper at fault (packaging, loading, BOL errors), was it force majeure, or is the cause still unknown? Match against the carrier's likely Carmack defenses (act of God, public enemy, shipper act, public authority, inherent vice; the burden to prove one sits with the carrier). A delay with a clean POD points at scheduling or capacity, not damage; a shortage with a clean piece count at origin points at pilferage or cross-shipment.
assets/escalation-templates.md. Tone-calibrate per relationship (collaborative for a good carrier, formal with contract citations when the relationship is strained).File the claim package in writing: shipment ID, asserted liability, a specified or determinable dollar amount, BOL, POD with exceptions noted, photos, invoice, and (for temperature) recorder data. Track it, answer carrier information requests fast (silence gets the file closed), and close with the customer once money or replacement lands. Log the outcome and the root cause so the lane learns; see Operating Rules.
Every exception run produces:
bin/claim_deadline.py, plus which filing is due first.publisher key 2e43c913833850e6d80f939677e3de76e806d47785c0f1caaca90f9d18c98e1e
No ratings yet — be the first to rate it.